INPUTS Reset
Karnataka
Injection tariff
3
Grid Tariff
7.08
Maximum Savings
Grid Tariff - (OA charge) min
7.08 - 4.04
3.04
Landed tariff
Solar
Captive
4.08
Solar captive charge
STU Charges
0.12
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.15
Wheeling losses
0.11
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.60
Third party
6.18
Solar third party charge
STU Charges
0.12
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.15
Wheeling losses
0.11
Cross subsidy
1.86
Additional Surcharge
0.24
Other Charges
0.60
Wind
Captive
4.04
Wind captive charge
STU Charges
0.08
STU losses
0.09
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.15
Wheeling losses
0.11
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.60
Third party
6.14
Wind third party charge
STU Charges
0.08
STU losses
0.09
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.15
Wheeling losses
0.11
Cross subsidy
1.86
Additional Surcharge
0.24
Other Charges
0.60
Conventional
Third party
7.50
Conventional third party charge
STU Charges
0.23
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.31
Wheeling losses
0.12
Cross subsidy
1.86
Additional Surcharge
1.87
Other Charges
0.01
Tamil Nadu
Injection tariff
3
Grid Tariff
6.92
Maximum Savings
Grid Tariff - (OA charge) min
6.92 - 3.88
3.04
Landed tariff
Solar
Captive
4.12
Solar captive charge
STU Charges
0.25
STU losses
0.06
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.11
Wheeling losses
0.06
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.64
Third party
4.62
Solar third party charge
STU Charges
0.25
STU losses
0.06
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.11
Wheeling losses
0.06
Cross subsidy
0.50
Additional Surcharge
0.00
Other Charges
0.64
Wind
Captive
3.88
Wind captive charge
STU Charges
0.18
STU losses
0.06
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.11
Wheeling losses
0.06
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.48
Third party
4.55
Wind third party charge
STU Charges
0.18
STU losses
0.06
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.11
Wheeling losses
0.06
Cross subsidy
0.67
Additional Surcharge
0.00
Other Charges
0.48
Conventional
Third party
6.09
Conventional third party charge
STU Charges
0.51
STU losses
0.06
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.21
Wheeling losses
0.07
Cross subsidy
1.67
Additional Surcharge
0.00
Other Charges
0.57
Andhra Pradesh
Injection tariff
3
Grid Tariff
6.36
Maximum Savings
Grid Tariff - (OA charge) min
6.36 - 7.12
(-0.75)
Landed tariff
Solar
Captive
8.32
Solar captive charge
STU Charges
0.92
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
2.66
Wheeling losses
0.68
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.94
Third party
9.99
Solar third party charge
STU Charges
0.92
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
2.66
Wheeling losses
0.68
Cross subsidy
1.67
Additional Surcharge
0.00
Other Charges
0.94
Wind
Captive
7.12
Wind captive charge
STU Charges
0.66
STU losses
0.12
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
1.90
Wheeling losses
0.57
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.86
Third party
8.79
Wind third party charge
STU Charges
0.66
STU losses
0.12
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
1.90
Wheeling losses
0.57
Cross subsidy
1.67
Additional Surcharge
0.00
Other Charges
0.86
Conventional
Third party
9.07
Conventional third party charge
STU Charges
0.92
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
2.66
Wheeling losses
0.68
Cross subsidy
1.67
Additional Surcharge
0.00
Other Charges
0.02
Chhattisgarh
Injection tariff
3
Grid Tariff
6.54
Maximum Savings
Grid Tariff - (OA charge) min
6.54 - 4.33
2.20
Landed tariff
Solar
Captive
4.74
Solar captive charge
STU Charges
0.00
STU losses
0.09
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.00
Wheeling losses
0.20
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
1.45
Third party
5.31
Solar third party charge
STU Charges
0.00
STU losses
0.09
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.00
Wheeling losses
0.20
Cross subsidy
0.57
Additional Surcharge
0.00
Other Charges
1.45
Wind
Captive
4.33
Wind captive charge
STU Charges
0.00
STU losses
0.09
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.00
Wheeling losses
0.20
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
1.04
Third party
4.90
Wind third party charge
STU Charges
0.00
STU losses
0.09
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.00
Wheeling losses
0.20
Cross subsidy
0.57
Additional Surcharge
0.00
Other Charges
1.04
Conventional
Third party
6.48
Conventional third party charge
STU Charges
0.32
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.24
Wheeling losses
0.23
Cross subsidy
1.14
Additional Surcharge
0.00
Other Charges
1.44
Gujarat
Injection tariff
3
Grid Tariff
4.58
Maximum Savings
Grid Tariff - (OA charge) min
4.58 - 4.64
(-0.05)
Landed tariff
Solar
Captive
5.04
Solar captive charge
STU Charges
0.36
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.17
Wheeling losses
0.00
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
1.38
Third party
7.21
Solar third party charge
STU Charges
0.36
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.17
Wheeling losses
0.00
Cross subsidy
1.48
Additional Surcharge
0.69
Other Charges
1.38
Wind
Captive
4.64
Wind captive charge
STU Charges
0.36
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.08
Wheeling losses
0.00
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
1.06
Third party
5.80
Wind third party charge
STU Charges
0.36
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.17
Wheeling losses
0.00
Cross subsidy
0.74
Additional Surcharge
0.34
Other Charges
1.06
Conventional
Third party
6.94
Conventional third party charge
STU Charges
0.36
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.17
Wheeling losses
0.00
Cross subsidy
1.48
Additional Surcharge
0.69
Other Charges
1.11
Haryana
Injection tariff
3
Grid Tariff
5.84
Maximum Savings
Grid Tariff - (OA charge) min
5.84 - 4.89
0.94
Landed tariff
Solar
Captive
4.90
Solar captive charge
STU Charges
0.36
STU losses
0.07
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.86
Wheeling losses
0.29
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.31
Third party
7.07
Solar third party charge
STU Charges
0.36
STU losses
0.07
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.86
Wheeling losses
0.29
Cross subsidy
1.02
Additional Surcharge
1.15
Other Charges
0.31
Wind
Captive
4.89
Wind captive charge
STU Charges
0.36
STU losses
0.07
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.86
Wheeling losses
0.29
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.31
Third party
7.06
Wind third party charge
STU Charges
0.36
STU losses
0.07
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.86
Wheeling losses
0.29
Cross subsidy
1.02
Additional Surcharge
1.15
Other Charges
0.31
Conventional
Third party
6.78
Conventional third party charge
STU Charges
0.36
STU losses
0.07
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.86
Wheeling losses
0.29
Cross subsidy
1.02
Additional Surcharge
1.15
Other Charges
0.03
Jharkhand
Injection tariff
3
Grid Tariff
5.57
Maximum Savings
Grid Tariff - (OA charge) min
5.57 - 4.82
0.76
Landed tariff
Solar
Captive
5.14
Solar captive charge
STU Charges
0.25
STU losses
0.07
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.32
Wheeling losses
0.32
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
1.18
Third party
6.55
Solar third party charge
STU Charges
0.25
STU losses
0.07
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.32
Wheeling losses
0.32
Cross subsidy
1.41
Additional Surcharge
0.00
Other Charges
1.18
Wind
Captive
4.82
Wind captive charge
STU Charges
0.25
STU losses
0.07
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.32
Wheeling losses
0.32
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.86
Third party
6.23
Wind third party charge
STU Charges
0.25
STU losses
0.07
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.32
Wheeling losses
0.32
Cross subsidy
1.41
Additional Surcharge
0.00
Other Charges
0.86
Conventional
Third party
6.83
Conventional third party charge
STU Charges
0.25
STU losses
0.07
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.64
Wheeling losses
0.34
Cross subsidy
1.41
Additional Surcharge
0.00
Other Charges
1.11
Kerala
Injection tariff
3
Grid Tariff
5.75
Maximum Savings
Grid Tariff - (OA charge) min
5.75 - 4.44
1.31
Landed tariff
Solar
Captive
4.45
Solar captive charge
STU Charges
0.47
STU losses
0.14
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.55
Wheeling losses
0.23
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.07
Third party
5.85
Solar third party charge
STU Charges
0.47
STU losses
0.14
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.55
Wheeling losses
0.23
Cross subsidy
1.40
Additional Surcharge
0.00
Other Charges
0.07
Wind
Captive
4.44
Wind captive charge
STU Charges
0.47
STU losses
0.14
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.55
Wheeling losses
0.23
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.06
Third party
5.84
Wind third party charge
STU Charges
0.47
STU losses
0.14
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.55
Wheeling losses
0.23
Cross subsidy
1.40
Additional Surcharge
0.00
Other Charges
0.06
Conventional
Third party
5.82
Conventional third party charge
STU Charges
0.47
STU losses
0.14
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.55
Wheeling losses
0.23
Cross subsidy
1.40
Additional Surcharge
0.00
Other Charges
0.04
Madhya Pradesh
Injection tariff
3
Grid Tariff
6.58
Maximum Savings
Grid Tariff - (OA charge) min
6.58 - 5.15
1.43
Landed tariff
Solar
Captive
5.16
Solar captive charge
STU Charges
0.43
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.25
Wheeling losses
0.20
Cross subsidy
0.00
Additional Surcharge
1.11
Other Charges
0.06
Third party
6.76
Solar third party charge
STU Charges
0.43
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.25
Wheeling losses
0.20
Cross subsidy
1.60
Additional Surcharge
1.11
Other Charges
0.06
Wind
Captive
5.15
Wind captive charge
STU Charges
0.43
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.25
Wheeling losses
0.20
Cross subsidy
0.00
Additional Surcharge
1.11
Other Charges
0.05
Third party
6.75
Wind third party charge
STU Charges
0.43
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.25
Wheeling losses
0.20
Cross subsidy
1.60
Additional Surcharge
1.11
Other Charges
0.05
Conventional
Third party
7.64
Conventional third party charge
STU Charges
1.28
STU losses
0.12
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.25
Wheeling losses
0.25
Cross subsidy
1.60
Additional Surcharge
1.11
Other Charges
0.04
Maharashtra
Injection tariff
3
Grid Tariff
7.3
Maximum Savings
Grid Tariff - (OA charge) min
7.3 - 6.63
0.67
Landed tariff
Solar
Captive
6.80
Solar captive charge
STU Charges
0.82
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.57
Wheeling losses
0.37
Cross subsidy
0.00
Additional Surcharge
1.33
Other Charges
0.59
Third party
8.51
Solar third party charge
STU Charges
0.82
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.57
Wheeling losses
0.37
Cross subsidy
1.71
Additional Surcharge
1.33
Other Charges
0.59
Wind
Captive
6.63
Wind captive charge
STU Charges
0.82
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.57
Wheeling losses
0.37
Cross subsidy
0.00
Additional Surcharge
1.33
Other Charges
0.42
Third party
8.34
Wind third party charge
STU Charges
0.82
STU losses
0.13
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.57
Wheeling losses
0.37
Cross subsidy
1.71
Additional Surcharge
1.33
Other Charges
0.42
Conventional
Third party
8.04
Conventional third party charge
STU Charges
0.41
STU losses
0.11
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.57
Wheeling losses
0.33
Cross subsidy
1.71
Additional Surcharge
1.33
Other Charges
0.57
Odisha
Injection tariff
3
Grid Tariff
4.7
Maximum Savings
Grid Tariff - (OA charge) min
4.7 - 5.0
(-0.30)
Landed tariff
Solar
Captive
5.32
Solar captive charge
STU Charges
0.06
STU losses
0.09
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.16
Wheeling losses
0.29
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
1.73
Third party
5.32
Solar third party charge
STU Charges
0.06
STU losses
0.09
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.16
Wheeling losses
0.29
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
1.73
Wind
Captive
5.00
Wind captive charge
STU Charges
0.06
STU losses
0.09
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.16
Wheeling losses
0.29
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
1.41
Third party
5.00
Wind third party charge
STU Charges
0.06
STU losses
0.09
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.16
Wheeling losses
0.29
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
1.41
Conventional
Third party
6.66
Conventional third party charge
STU Charges
0.28
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.78
Wheeling losses
0.36
Cross subsidy
1.03
Additional Surcharge
0.00
Other Charges
1.11
Punjab
Injection tariff
3
Grid Tariff
6.6
Maximum Savings
Grid Tariff - (OA charge) min
6.6 - 4.48
2.13
Landed tariff
Solar
Captive
4.59
Solar captive charge
STU Charges
0.23
STU losses
0.08
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.68
Wheeling losses
0.21
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.39
Third party
6.07
Solar third party charge
STU Charges
0.23
STU losses
0.08
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.68
Wheeling losses
0.21
Cross subsidy
0.65
Additional Surcharge
0.83
Other Charges
0.39
Wind
Captive
4.48
Wind captive charge
STU Charges
0.23
STU losses
0.08
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.68
Wheeling losses
0.21
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.28
Third party
5.96
Wind third party charge
STU Charges
0.23
STU losses
0.08
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.68
Wheeling losses
0.21
Cross subsidy
0.65
Additional Surcharge
0.83
Other Charges
0.28
Conventional
Third party
6.07
Conventional third party charge
STU Charges
0.23
STU losses
0.08
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.68
Wheeling losses
0.21
Cross subsidy
0.65
Additional Surcharge
0.83
Other Charges
0.39
Rajasthan
Injection tariff
3
Grid Tariff
6.58
Maximum Savings
Grid Tariff - (OA charge) min
6.58 - 4.09
2.48
Landed tariff
Solar
Captive
4.29
Solar captive charge
STU Charges
0.14
STU losses
0.11
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.16
Wheeling losses
0.49
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.39
Third party
5.09
Solar third party charge
STU Charges
0.14
STU losses
0.11
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.16
Wheeling losses
0.49
Cross subsidy
0.00
Additional Surcharge
0.80
Other Charges
0.39
Wind
Captive
4.09
Wind captive charge
STU Charges
0.07
STU losses
0.11
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.08
Wheeling losses
0.47
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.37
Third party
4.89
Wind third party charge
STU Charges
0.07
STU losses
0.11
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.08
Wheeling losses
0.47
Cross subsidy
0.00
Additional Surcharge
0.80
Other Charges
0.37
Conventional
Third party
6.87
Conventional third party charge
STU Charges
0.28
STU losses
0.11
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.32
Wheeling losses
0.54
Cross subsidy
1.78
Additional Surcharge
0.80
Other Charges
0.04
Uttar Pradesh
Injection tariff
3
Grid Tariff
7.1
Maximum Savings
Grid Tariff - (OA charge) min
7.1 - 3.99
3.11
Landed tariff
Solar
Captive
3.99
Solar captive charge
STU Charges
0.12
STU losses
0.11
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.38
Wheeling losses
0.30
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.08
Third party
3.99
Solar third party charge
STU Charges
0.12
STU losses
0.11
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.38
Wheeling losses
0.30
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.08
Wind
Captive
4.53
Wind captive charge
STU Charges
0.25
STU losses
0.11
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.75
Wheeling losses
0.35
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.07
Third party
5.46
Wind third party charge
STU Charges
0.25
STU losses
0.11
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.75
Wheeling losses
0.35
Cross subsidy
0.93
Additional Surcharge
0.00
Other Charges
0.07
Conventional
Third party
5.42
Conventional third party charge
STU Charges
0.25
STU losses
0.11
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
0.75
Wheeling losses
0.35
Cross subsidy
0.93
Additional Surcharge
0.00
Other Charges
0.03
West Bengal
Injection tariff
3
Grid Tariff
7.15
Maximum Savings
Grid Tariff - (OA charge) min
7.15 - 5.5
1.65
Landed tariff
Solar
Captive
5.50
Solar captive charge
STU Charges
0.24
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
1.04
Wheeling losses
0.38
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.73
Third party
9.04
Solar third party charge
STU Charges
0.24
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
1.04
Wheeling losses
0.38
Cross subsidy
3.54
Additional Surcharge
0.00
Other Charges
0.73
Wind
Captive
5.50
Wind captive charge
STU Charges
0.24
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
1.04
Wheeling losses
0.38
Cross subsidy
0.00
Additional Surcharge
0.00
Other Charges
0.73
Third party
9.04
Wind third party charge
STU Charges
0.24
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
1.04
Wheeling losses
0.38
Cross subsidy
3.54
Additional Surcharge
0.00
Other Charges
0.73
Conventional
Third party
8.35
Conventional third party charge
STU Charges
0.24
STU losses
0.10
CTU/POC charges
0.00
CTU/POC losses
0.00
Wheeling Charges
1.04
Wheeling losses
0.38
Cross subsidy
3.54
Additional Surcharge
0.00
Other Charges
0.04
>3.0
0-3.0
< 0
Difference between grid tariff and landed open access tariff for a state (INR/kWh)
CEEW Centre for Energy Finance does not officially endorse political boundaries on the website. Maps are for illustrative purposes only.
All figures in INR/kWh
Grid tariff is the variable electricity tariff for an industrial consumer with 1 MW load, 80% load factor and connected at 11 kV voltage
Disclaimer - "The above calculations are based on state tariff orders and regulations applicable for FY 2021-22. While utmost care has been taken to avoid any errors, user discretion is advised while using the tool. CEEW-CEF and CEEW assume no legal responsibility or financial liability for the omissions, errors and inaccuracies in the analysis."